| Project: |
Paiton Steam Power
Plant Units 1&2 |
| Capacity: |
2x400 MW Coal-Fired |
| Year: |
Jun.91 – Apr.94 |
| Owner: |
PLN |
| Clients:
|
ABB Combustion Engineering
PT.Energy System Indonesia
ABB Gadelius KK |
| Scope
of work: |
| |
Installation of 2x1,200 t/h
coal-fired
Boilers, Auxiliaries & Insulation
Supply Insulation for Steam
Generator & Auxialiaries
Installation of Fly Ash Pnuematic
Transport System |
|
| |
 |
| Project: |
Paiton Steam Power
Plants Units 5&6 |
| Capacity: |
2x660 MW Coal-Fired |
| Year: |
Jan.96 – Jul.99 |
| Owner: |
PT.Jawa Power |
| Clients:
|
ABB Combustion Engineering/
PT.Jurong Engineering Lestari
Black & Veatch International
|
| Scope
of work: |
| |
Installation of 2 units Boiler
and Auxiliaries
Installation of Electrostatic
Precipitator
Installation of Mechanical &
Piping for
the Balance of Plant
Installation of Electrical for
Balance of
Plant |
|
| |
|
 |
| Project: |
Paiton Steam Power
Plant Units 7&8 |
| Capacity: |
2x660 MW Coal-Fired |
| Year: |
Nov.95 – Jan.99 |
| Owner: |
PT.Paiton Energy |
| Clients:
|
ABB Combustion Engineering/
JEL
Taihei Dengyo Kaisha Ltd.
Shinwa Engineering
ABB Gadelius K.K.
Toyo Engineering Corp. |
| Scope
of work: |
| |
Installation of 2 units Steam
Generator
Installation of 2 units Boiler
&
Accessories
Installation of Chimney Liner
Plates
Installation of Critical Piping
Fabricate & Erect Turbine
Building
Steel Structures
Fabrication of Flue Gas Ducts
Boiler Steel Structure painting
works |
|
| |
|
 |
| Project: |
Gresik Combined
Cycle Power Plant |
| Capacity: |
1,500 MW |
| Year: |
Mar. 91 – Jan. 94 |
| Owner: |
PLN |
| Clients:
|
Mitsubishi
Corporation
Cockerill M.I. |
| Scope
of work: |
| |
Installation of 9x100 MW Gas
Turbine
Installation of 9x160 t/h HRSG
&
Auxiliaries
Installation of 3x200 MW Steam
Turbine & Auxiliaries
Supply & fabricate pipe
racks, structural
steel, fire protection system
piping.
Supply & fabricate ducts,
casings &
chimney |
|
| |
|
 |
| Project: |
Grati Combined
Cycle Power Plant |
| Capacity: |
800 MW |
| Year: |
Nov.94 – Jan.97 |
| Owner: |
PLN |
| Clients:
|
Mitsubishi
Heavy Industries |
| Scope
of work: |
| |
Installation of Gas &
Steam Turbines
Generator & Auxiliaries
Installation of 3 units HRSG
and
Auxiliaries
Fabrication of Ductings,Casing
&
Chimney for 3 units HRSG
Fabrication of Stack bottom
plate
Supply & Fabrication Piping
for
Firefighting
EPC of 4 nos. HSD Oil Tank |
|
| |
|
 |
| Project: |
SURALAYA STEAM
POWER PLANT No. 5,6 & 7 |
| Capacity: |
3 x 600 MW |
| Year: |
Aug.94 – Feb.98 |
| Location: |
Suralaya, West Java |
| Owner: |
PT.PLN |
| Clients:
|
Mitsubishi
Heavy Ind. |
| Scope
of work: |
| |
Installation of 3x600 MW Steam
Turbines & Aux. |
|
| |
|
 |
| Project: |
SURALAYA STEAM
POWER PLANT No. 5,6 &7 |
| Capacity: |
3x600 MW Coal-Fired |
| Year: |
Mar.94 – Nov.97 |
| Owner: |
PLN |
| Clients:
|
Marubeni
Corp./TDK
Mitsubishi Heavy Industries
PT.Basuki Pratama
Nuova Cimimontubi |
| Scope
of work: |
| |
Installation of 3 units Boiler
and
Electrostatic Precipitators
& Accessories
Installation of 3 units Steam
Turbine
Generators & Piping
Installation of Stack Liner
Supply & install Fire Fighting
System
Material & Warehouse Management |
|
| |
|
|
|
|
|
|
| Project: |
INDOCEMENT PROJECT |
| Year: |
Various from 1991 to 1997 |
| Owner: |
PT.Indocement Tunggal |
| Clients:
|
PT.Indocement Tunggal |
| Scope of work: |
| |
Supply, Fabricate & Install Clinker
Handling System
Fabricate & erect Electrostatic
Precipitator & Associated
Mechanical equipment.
Electrostatic Precipitator for P3
Clinker Cooler installation
including Civil, Mechanical &
Fabrication
Supply, Fabricate & Erect P! ESP
Grate Cooler & Cement Mill.
Supply & fabricate Raw Mill /Kiln
ESP, & Klinker Cooler ESP
Mechanical & Civil works for P7
Kiln & Cooler Conversion and P7
CFG Cooler EP. |
|
| |
 |
| Project: |
Cibinong Cement Plant |
| Year: |
Jan.90 – Nov.90 |
| Owner: |
PT.Semen Cibinong |
| Clients:
|
PT. Trio Wap Bumi |
| Scope of work: |
| |
Fabrication & erection of
2 units Electrostatic
Precipitator
Fabrication & erection of
Ducting structure of Kiln &
Coolers |
|
|
|
| |
|
|
| Project: |
KALTIM FERTILIZER OPTIMALIZATION
|
| Location: |
Bontang, East Kalimantan |
| Year: |
Nov.97 – Oct.98 |
| Owner: |
PT.Pupuk Kalimantan Timur |
| Clients:
|
PT.Rekayasa Industries |
| Scope of work: |
| |
Installation of Steel Structures
Installation of Mechanical
Equipment
Installation of Pipes |
|
| |
|
 |
| Project: |
KALTIM 3 Fertilizer Plant |
| Location: |
Bontang, East Kalimantan |
| Year: |
1988 |
| Owner: |
PT.Pupuk Kalimantan Timur |
| Clients:
|
PT.Rekayasa Industri/Chiyoda
Chemical Eng’g Co. |
| Scope of work: |
| |
Installation of Mechanical Equipment
Installation of Boiler
Installation of Piping |
|
| |
|
|
|
| |
|
| Project: |
BONTANG LNG TRAIN “F”
|
| Year: |
Jun.92 – Nov.93 |
| Owner: |
PT.Badak LNG |
| Clients:
|
PT. IKPT / Chiyoda Corp.
|
| Scope of work: |
| |
Inland Transportation
Heavy Lifts
Mechanical Erection works |
|
| |
|
 |
| Project: |
NSO “A” Field Development
|
| Year: |
Nov..97 – Jan. 99 |
| Owner: |
Owner Mobil Oil |
| Clients:
|
PT. Tripatra |
| Scope of work: |
| |
Steel Structures
Inland Transportation
Heavy Lift s
All Mechanical Works |
|
| |
|
 |
| Project: |
COMPRESSOR |
| Year: |
Nov..97 – Jan. 99 |
| Owner: |
Owner Mobil Oil |
| Clients:
|
PT. Tripatra |
| Scope of work: |
| |
Inland Transportation
Heavy Lift
All Mechanical Works |
|
|
|
|
 |
| Project: |
MUSI PULP MILL |
| Year: |
Jan.98 – Jun.99 |
| Owner: |
PT.Tanjung Enim Lestari |
| Clients:
|
Klockner –
INA GmBH |
| Scope of work: |
| |
Total Electro-Mechanical
Works of the Plant
Plant Maintenance
Security Management |
|
| |
|

|
| Project: |
RIAU ANDALAN PULP & PAPER |
| Year: |
Aug.96 – On-going |
| Owner: |
PT.Tanjung Enim Lestari Pulp & Paper |
| Clients:
|
PT.Bina Sarana
Pengembangan
PT.Pectech Indonesia |
| Scope of work: |
| |
Civil & Pre-casting works
Mechanical & Piping erection of Paper
Machine
Converter Building Erection
Installation of Recovery Boilers
no.2 & 3
Electrical & Instrumentation works for
Paper machine
Mechanical & Piping works of Evaporator
Plant
Mechanical & Piping Installation for Fibre
Line no.1
Mechanical & Piping works for
Recausticizing Plant no.2
Civil works for:
Aeration Basin
Pre-casting Pulp Dryer no.3 & Structural
Steelworks
Pulp Machine, Pulp Dryer & Pulp buildings |
| |
|
|
|
|
| |
|

|
| Project: |
INCO NICKEL SMELTER PLANT
EXPANSION |
| Year: |
Sep.89 – In Progress |
| Owner: |
PT.International Nickel Co.
(INCO) |
| Clients:
|
PT. INCO
Davy Int’l/Beca Simons Ltd
PT.Fluor Daniel Indonesia |
| Scope of work: |
| |
Foundation for Kiln 4
Install new Kiln 4, ESP, Conveyors,
Calcine Transfer, Granulation and all associated
Steel Structures,
Piping,Electrical & Instrumentation,
rebuilding/relining of existing kilns.
Rebuilding of Furnace 2& 3, Kiln 1,2
&3 and Dryers.
Install Kiln 5, Coal Transfer Conveyor,
New Dryer 3, relocation of sewers,
drains & piping, new ESP &
Multiclones.
Install Sulphur Melt System
(M/P/E/I)
Modification of DOS 1, repairs to
Dryer 1&2,Kiln 1 refurbishment
Architectural/HVAC Balance of
Building. |
| |
|
| |
|
| |
|
|
| |
|
|
|
| |
|

|
| Project: |
Rehab T-5 Gasoline Tank &
Repair of 4 Storage Tanks |
| Location: |
Mesaieed |
| Size: |
22 m H x 60 m Dia. Floating roof |
| Year: |
Aug.2001 – . 2002 |
| Owner: |
Qatar Petroleum |
| Scope of work: |
| |
Mechanical Works
On-site steel fabrication
Repairs
Desludging
Cleaning & gas freeing
Install fire protection systems & rim
seals
|
| |
|
|
| |
|
|
| |
|