Services  
  Clients  
  Resources  
  Jobs  
  Links  
  Contact us  
 


Search    

 Contact Information
Truba Arabia Co. Ltd.
P.O. Box 13843,
Jeddah 21414
Kingdom of Saudi Arabia
Tel: +966 2 664 0477
Fax: +966 2 667 0517
info@trubarabia.com
 
 
 
 
 
 
 
 
 
As a Construction Services provider to Power and Industrial Plants, our business is delivering “Custom-made jobs” according to Client Specifications and industry standards.
 
To ensure Client requirements are met, Truba Arabia shall always be consistent in producing the best results by:
   

 

• Strict adherence to SAFE work practices.
• Compliance to QUALITY standards and specifications.
• On time DELIVERY / SCHEDULE.
• Competitive COST.
• Effective COMMUNICATION.
• Practicing PDCA (Plan-Do-Check-Action) cycle.
• Training.

PROCESS IMPROVEMENT

QA SYSTEM:
Truba Arabia’s Quality Assurance and management systems are compatible with PT.Truba Jurong Engineering (TJE) systems.
TJE provides the technical support to Truba Arabia in developing and maintaining its QA/QC system.

TJE’s QUALITY ASSURANCE IS CERTIFIED ISO 9000 INTERNATIONAL STANDARD

SCOPE:
“ Project management, engineering, procurement, fabrication and construction of industrial plants, power plants, oil & gas plants, mining plant and fertilizer plant.”

CERTIFICATIONS HISTORY:

1993
Received ISO 9002 certification (no.931631) by Lloyds Register QA (LRQA), also accredited by German and Dutch Quality Councils.
1996
The certificate was upgraded to ISO 9001 to include design engineering activitied.
2003
The certificate was upgraded to ISO 9000:2000

AUTHORIZATION BY AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
TJE is accredited by ASME for Stamp “S” with the scope of:
“ Design and assembly of power boilers with fabrication subcontracted to holders of appropriate certificates of authorization and field assembly at field sites controlled by the above location.

TJE is authorized by the National Board of Boiler & Pressure Vessel Inspection for Stamp “R” with the scope of:
“Repair and alterations at the above locations and extended for field repairs and/or alterations controlled by this location.”

TRUBA ARABIA QA/QC:

As a minimum, every Truba Arabia project adheres to or implements the following QA requirements:
- Project Quality plan
- Inspection and testing plan
- Technical procedures
- Document control
- Approved vendors list
- Identification and traceability
- Non conformance report
- Quality audit
- Control of inspection, measuring and testing equipment
- Site management representative